Check notification format, time bar compliance, clause references, compensation event procedures, and payment provisions. Every finding traced to the specific NEC4 clause.
Upload notifications, early warnings, CE communications, programme submissions, and payment certificates. Every document processed against the relevant NEC4 clauses.
Each communication assessed against the specific NEC4 clause requirements — format, timing, content, and clause references. Time bar calculations checked automatically.
RAG-rated report shows which notifications comply, which are at risk of time bar, and which have already lapsed. Prioritised actions to protect your commercial position.
Mapped from NEC4 ECC clause requirements. The actual procedural tests that determine whether your notifications are valid, your time bars are met, and your commercial position is protected.
NEC4 is a procedural contract. Get the procedure wrong and the substance doesn't matter. Most commercial disputes on NEC contracts originate from procedural failures, not technical disagreements.
Compensation event CE-017 was notified 11 weeks after the event. Clause 61.3 requires notification within 8 weeks. The Contractor is time-barred unless the Project Manager notified the event separately.
See how your NEC4 correspondence scores against procedural requirements. A demo takes 30 minutes — we'll assess real correspondence so you see exactly where you stand.
Request a Demo